Since 1 January 2013, an investment of 96 million has been invested in the borough, which is the largest ever investment in the borough's highways infrastructure over such a short period.

This investment has resulted in Hounslow being ranked 2nd best borough in London for road condition - going from one of the worst performing in 32nd out of 33, to one of the best.

 

Here is what we have done so far in the Core Investment Period upgrade (2013-2017) on the borough's roads and streets:

  • Replaced 13,000 traffic signs to the highest visibility and reflectivity standards
  • 1,041 footpaths treated (resurfaced approx. 230km)
  • 1,164 carriageways treated (resurfacing of approx. 206km)
  • Approx. 30,000m2 of High Friction Surface (anti-skid treatment to roads) has been applied on the Network
  • Refurbishment of five major structures, including the iconic Augustus Road Bridge.
  • Upgraded 10 specialist sites as high priority strategic roads making them fit for purpose for the next 20 years, including Hatton Road and Green Lane

 

Core Investment Period - what we did

  Carriageways (RSLs) Footways (RSLs & FSLs)
CIP year 1-5 At baseline Actual At baseline Actual
2013 446 225 187 220
2014 426 272 164 181
2015 475 221 275 176
2016 443 248 233 261
2017 393 198 177 203
Total 2,183 1,164 1,036 1,041

Please note that the above is indicative of Road Section Lengths (RSLs) and Footway Section Lengths (FSLs) and not whole roads.

Each road is divided into smaller sections called RSLs and FSLs to improve the quality of the inspection and construction process by making work areas more manageable.

 

Core Investment Period - what we completed

RSLs treated by ward 2013 2014 2015 2016 2017 Total
Bedfont  10 36 16 24 15 101
Brentford  8  8  10  9  7  42
Chiswick Homefields  17  17  22  16  3  75
Chiswick Riverside  7  7  5  18  6  43
Cranford  6  15  7  15  4  47
Feltham North  12  10  13  14  16  68
Feltham West  12  21  4  8  13  58
Hanworth  10  11  9  18  19  67
Hanworth Park  12  7  13  22  24  78
Heston Central  7  7  12  4  8  38
Heston East  7  16  11  4  5  43
Heston West  18  14  5  10  6  53
Hounslow Central  18  15  16  13  11  73
Hounslow Heath  22  12  10  3  7  54
Hounslow South  7  9  7  12  10  45
Hounslow West  12  10  8  11  7  48
Isleworth  10  13  9  5  9  46
Osterley  7  13  7  20  9  56
Syon  13  14  20  8  9  64
Turnham Green  10  17  14  14  10  65
Grand total 225 272 221 248 198 1,164

RSLs completed in each Ward. These figures display the number of RSLs completed during CIP and not whole roads.